The strengthening of water infrastructure in Panama continues to advance with the project for the Design and Construction of the Expansion and Improvements to the Mendoza Water Treatment Plant, developed for the Panama Canal Authority (ACP).

In this process, ALIA Concretos supports the Etap Mendoza Consortium through the supply and technical assistance in the pouring of piles in the raw water intake area, a critical phase for the overall stability of the project.

A key contribution to the project’s foundation Pile pouring is a vital stage in hydraulic infrastructure. ALIA Concretos’ support ensures:

  • Superior quality in concrete supply.
  • Strict compliance with technical specifications.
  • Efficiency in construction processes.
  • Structural resistance under demanding conditions.

This expansion will increase the production and distribution capacity of drinking water, benefiting thousands of people. ALIA Concretos thus reaffirms its commitment to developing solutions that strengthen national infrastructure.